Summary of Contents for Clean Water Systems Fleck 9100
Page 1
Fleck 9100 Nitrate Filter Installation & Start-Up Guide Thank you for purchasing a Clean Water System! With proper installation and a little routine maintenance your system will be providing filtered water for many years. Your new system comes with a printed Fleck Service manual, which along with this start-up guide will help guide you in the installation and start-up of your new system.
Page 2
1. See typical installation (see Fig 1). The nitrate filter is installed after the pressure tank. 2. Make sure to connect the inlet pipe to the Fleck 9100 inlet and the outlet to the outlet (see Fig 2). You can see the in and out arrows on the bypass valve which is where the pipes are connected.
Page 3
5. You do not need unions to install your nitrate filter. If you need to remove it, the Fleck 9100 has quick-release couplings on the bypass valve that make it easy to put the nitrate filter on by-pass and remove the filter system from the piping.
Page 4
Adding Media & Installation Instructions 1. Unscrew by hand the Fleck 9100 control valve from top of the tanks if it was shipped screwed on. Place distributor tubes in tank if not already inside tanks. If not already done, make sure blue cap is on top of distributor tubes, or wrap the top of distributor tubes with electrical or duct tape.
Page 5
At the end of the regeneration (90 minutes) check to make sure that the nitrate filter has added water to the bottom of the brine tank to make brine for the next regeneration cycle. Page 5 Fleck 9100 Nitrate filter Start-Up Guide Clean Water Systems 2009...
Need help?
Do you have a question about the Fleck 9100 and is the answer not in the manual?
Questions and answers