Rps Enablement Kit - HP ProLiant DL320e Gen8 Maintenance And Service Manual

Hide thumbs Also See for ProLiant DL320e Gen8:
Table of Contents

Advertisement

Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Do one of the following:
3.
Extend the server from the rack (on page 29).
o
Remove the server from the rack (on page 30).
o
Remove the access panel
4.
Remove the air baffle
5.
WARNING:
power supply blank to cool before touching it.
Remove the non-hot-plug power supply
6.
If installed, remove the dedicated iLO management port module.
7.
Remove the non-hot-plug power supply bracket.
8.
To replace the component, reverse the removal procedure.

RPS enablement kit

WARNING:
power supply blank to cool before touching it.
To remove the component:
Power down the server (on page 28).
1.
Remove all power:
2.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Do one of the following:
3.
Extend the server from the rack (on page 29).
o
("Access
panel" on page 35).
("Air
baffle" on page 35).
To reduce the risk of personal injury from hot surfaces, allow the power supply or
("Non-hot-plug power
To reduce the risk of personal injury from hot surfaces, allow the power supply or
supply" on page 57).
Removal and replacement procedures 58

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents