Chamberlain SL600 Installation Manual page 10

Slim gate operator
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION
8. Position the mounting plate relative to the gate
(Figure 5).
9. Run all cables through the knockout (Figure 6).
10. Mark the mounting hole locations, drill with
a masonry bit. Screw the mounting plate into
place with provided anchoring hardware
(Figure 6).
Figure 5
Rack
TOP VIEW OF GATE
Gate
Rack
Figure 6
Cables
10
11 cm
Mounting Plate
The distance between
the rack and the gate
should be 2.4 cm.
3 cm
Mounting Plate

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Sl1000

Table of Contents