Put thread locker on the upper balljoint threads.
Screw the upper ball joints into the control arms; make sure to screw the ball joints in from opposite
sides to give a right and left arm.
Tighten the balljoint using the arm for leverage with a Vice holding the ball joint.
33
www.factoryfive.com
508-291-3443