Manual Lighting Procedure - New Buck Corporation EMBER VISION 100 SERIES Installation Instructions Manual

Vent-free or vented 30”(oak) gas log set vent-free or vented 24”(oak or pine) gas log set for natural or liquid petroleum (l.p.) with optional heat shield model 19hs
Table of Contents

Advertisement

MANUAL LIGHTING PROCEDURE

1. If the pilot cannot be ignited with the piezo, it can be manually lit with the use of a paper
match and lighter rod.
2. Place the match in the holder and light. With the left hand, depress the control knob
counterclockwise
to "PILOT". Hold in.
3. Take rod and light match and ignite pilot. The pilot is located behind the right hand side
of the front log.
4. Continue to hold the control knob for an additional 1 (one) minute to ensure the pilot is lit.
Page 14

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ember vision 200 series

Table of Contents