Heat & Glo SL-550TR-E Owner's Manual page 28

Hide thumbs Also See for SL-550TR-E:
Table of Contents

Advertisement

V Minimum
SL-550TR-E
90 Elbow *
1/2 ft. 152 mm 1/2 ft. 152 mm
1/2 ft.*
152 mm
1 ft.
305 mm
1-1/2 ft.*
457 mm
2 ft.
610 mm
2-1/2 ft.*
762 mm
4 ft.
3-1/2 ft.
1.1 m
6 ft.
4-1/2 ft.
1.4 m
14 ft.
H + H
1
V + H + H
* See warning below
H
2
Fire Risk.
• When using SLP-HRC-SS and SLP-HRC-ZC-SS
termination caps on top vented fi replaces, a one
foot minimum vertical vent section is required before
installing fi rst elbow.
• When using DVP-TB1 termination cap on top vented fi replaces,
a three foot minimum vertical vent section is required before
installing fi rst elbow.
Figure 7.5
28
Top Vent - Horizontal Termination
Venting with two 90º elbows
H
+ H
Maximum
1
2
SL-750TR-E
SL-950TR-E
0 ft.
1 ft.
305 mm
1 ft.
2 ft.
610 mm
2 ft.
1.2 m
4 ft.
1.2 m
4 ft.
1.8 m
6 ft.
1.8 m
6 ft.
4.3 m
14 ft.
4.3 m
14 ft.
MAX. =14 ft. (4.3 m)
MAX. = 40 ft. (12.2 m)
1
INSTALLED
HORIZONTALLY
WARNING *
Heat & Glo • SL-550 / 750 / 950TR-E • 2118-900 Rev. U • 7/12
Note: Use SLP Series
components only.
0 mm
Note: There MUST be a 25%
305 mm
reduction in total H when using
610 mm
fl ex vent except when using the
simple up and out installation
1.2 m
(see Figure 7.3).
1.8 m
4.3 m
H
1
V
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents