Valve Clearance - Suzuki RM-Z250 Owner's Manual

Hide thumbs Also See for RM-Z250:
Table of Contents

Advertisement

VALVE CLEARANCE

• Remove the seat. (4-2)
• Remove the radiator covers and fuel tank. (4-2)
• Remove the ignition coil/plug cap and spark plug. (2-7)
• Remove the cylinder head cover 2 and gasket 3 by remov-
ing their bolts 1.
The valve clearance specification is different for both intake and
exhaust valves.
Valve clearance adjustment must be checked and adjusted: 1)
at the time of periodic maintenance, 2) when the valve mecha-
nism is serviced, and 3) when the camshafts are removed for
servicing.
NOTE:
* The piston must be at top dead center (TDC) on the compres-
sion stroke in order to check or adjust the valve clearance.
* The valve clearance should only be checked when the engine
is cold.
• Drain engine oil. (2-14)
• Remove the TDC plug 4 and crankshaft hole plug 5.
• Place a wrench over the crankshaft and turn it counter-clock-
wise to align the TDC mark A with the center of the groove B
of the timing inspection hole.
• Insert the thickness gauge between the tappet and cam. If the
clearance is out of specification, adjust it to specification as
follows.
 09900-20803: Thickness gauge
 Valve clearance (when cold):
Standard: IN. : 0.09 – 0.16 mm (0.004 – 0.006 in)
EX. : 0.17 – 0.24 mm (0.007 – 0.009 in)
PERIODIC MAINTENANCE 2-27

Advertisement

Table of Contents
loading

Table of Contents