User's Manual of WGSW-20160HP
Figure 2-6: Mounting Managed Switch in a Rack
Proceeds with the steps 4 and steps 5 of session 2.2.1 Desktop Installation to connect the network cabling and supply
Step6:
power to the Managed Switch.
2.2.3 Installing the SFP Transceiver
The sections describe how to insert an SFP transceiver into an SFP slot.
The SFP transceivers are hot-pluggable and hot-swappable. You can plug-in and out the transceiver to/from any SFP port
without having to power down the Managed Switch. As the
Figure 2-7
appears.
Figure 2-7: Plug-in the SFP Transceiver
36