Heat Exchanger; Pump - Baxi Genesis 80 Installation And Servicing Instructions

Gas fired wall mounted combination boiler
Table of Contents

Advertisement

Genesis
CHANGING COMPONENTS – Page 30
44 - 45
Supplied By www.heating spares.co Tel. 0161 620 6677

Heat Exchanger

Remove the combustion box door as described under
"Servicing the Appliance".
Undo the nut on the return pipe at the pump.
Remove the "R" clip on the flow pipe at the manifold.
Remove the clips securing the flow and return pipes to the
heat exchanger.
Ease the flow and .return pipes from the heat exchanger by
gently pulling downwards.
Pull the heat exchanger forwards and remove.
Reassemble in reverse order of dismantling, and re-
commission.

Pump

For ease of replacement fit a new pump head to the existing
housing.
A standard Grundfos UPS 15-50 pumphead is
interchangeable.
This must be switched to setting 3.
Baxi Heating Ltd.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Genesis 96

Table of Contents