Electrical Power Requirements; Selecting Location; Installing Unit; Placing Unit In Operating Location - Cornelius FCB 3 H.P. POST-MIX DISPENSER Installation & Service Manual

Two-flavor w/hot-gas defrost and v3+ features
Table of Contents

Advertisement

7. CASTER KIT (item 7) to be installed on the Unit as instructed in Instructions provided in the Kit.
8. All parts for the SOUND BAFFLE/DRIP TRAY ASS'Y (item 8) are shipped with the Dispenser in a
separate box and must be installed on the Dispenser during Dispenser installation.

ELECTRICAL POWER REQUIREMENTS

IMPORTANT: Before connecting electrical power to Unit, refer to nameplate and Note if Unit is to be
operated with 50 or 60 Hz power source.
A properly grounded 198-253 VAC, 60Hz single-phase electrical circuit with a 30-amp minimum-rated
disconnect switch (not provided) fused at 30 amps (slow-blow) or circuit connected through an equivalent HACR
circuit breaker must be available to the Unit. ALL WIRING MUST CONFORM TO NATIONAL AND LOCAL
CODES. MAKE SURE UNIT IS PROPERLY GROUNDED.

SELECTING LOCATION

CAUTION: This Unit is intended for indoor installation only. Do not install this Unit in an
outdoor environment which would expose it to the outside elements.
IMPORTANT: Unit operating ambient temperature MUST NOT EXCEED 100° F. Operating ambient in
excess of 100° F will automatically void the factory warranty and will eventually result in Unit failure.
Several means are available to achieve proper ambient temperature and air circulation around the Unit
which are wall air intake grilles and ceiling exhaust fans, air conditioning, etc. Consult local codes.
Locate Unit so the following requirements are satisfied.
1. Close to a plain water inlet supply line with a minimum pressure of 12-psig.
NOTE: "AIR-COOLED FCB DISPENSER
The "air-cooled" FCB Dispenser refrigeration system is equipped with a condenser coil that is cooled
by a condenser coil fan. Circulating air, required to cool the refrigeration system's condenser coil, is
drawn in through the grille on front and exhausted out through the sides and back of Unit. Restricting
air circulation through the Unit will decrease its cooling efficiency.
2. When installing Unit, do not allow obstruction to block grille on front which will block off air intake to inside
of Unit. If installation dictates only one side or back being unobstructed, allow 18-inches clearance between
Unit and obstruction. If both sides or one side and back are unobstructed, allow 12-inches clearance. If
both sides and back are unobstructed, allow 6-inches clearance.
CAUTION: Do not place or store anything on top of the Unit.

INSTALLING UNIT

PLACING UNIT IN OPERATING LOCATION

1. Place Unit in operating location meeting requirements of SELECTING LOCATION.
The FCB Dispensers manufactured prior to the model documented in this manual were elevated in the
front (dispensing valve side) 1/4 to 3/8-inch higher than the back when placing the Unit in operating
position to eliminate gas pockets being trapped inside the freeze cylinders. Due to a redesign of the foam
pack in the models documented in this manual, elevating the front of the Dispenser is no longer required.
The Dispenser must be leveled at time of placing in operating location.
IMPORTANT NOTICE
7
312026000

Advertisement

Table of Contents
loading

Table of Contents