Carrier Infinity ICS 58MVC 100 Series Installation Instructions Manual page 33

Direct vent 4-way multipoise condensing gas furnace
Hide thumbs Also See for Infinity ICS 58MVC 100 Series:
Table of Contents

Advertisement

Roof Te rmLnation
(Preferred)
between
combustbn
aEr and vent
8 3/4 in (222ram)for
3 in
(76ram)kit
Maintain
12 in
(305mm)_n
clearance
above
.......
hslghwe _ _e_aen
I.......
Concwntric
Vent and Combustion
Air
Roof [urmination
(pm_rmd)
......
Fig. 36 - Combustion
Air and Vent Termination
for Direct Vent (2-pipe)
System
R_f
Term_natbn
(Preferred)
A05090
_._-f
_"_"
_'_'_
above
Maintain
minimum
h_hest 12 ciearancein
anticipated
(305ram)
.........
_": i[
snow
level
maximum
of
24 in
(610ram)
abova
roof
.......
_--.
[
Abandoned
masonry
used
as
raceway
(per
code)
Side wall termination
X\\x\\x\
\
with
2 elbows
(preferred)
12 in
(3O5 ram)
rain
from
overhang
or roof
Maintain
12in
305ram
minimum
c earance
above
highest
anticipated
s_qow leve[
or glade
",_hichever
is greate_
12 in
rain (305
mm)fron
overhang
or r_f
6 in (152ram)
minimum
cieara_e
between
waiJ and end of vent
pipe
10 in (254mm)
maximum
pipe
Jen_[h
305ram)
minimum
clearance
above
highest
anticipated
snow
leveJ or grade
whichever
is greater
Sidewall
Tel minat_n
with
Stra_Jht
Pipe
(preferred)
Fig. 37 - Vent Pipe Termination
for Ventilated
Combustion
Air System
A05091
33

Advertisement

Table of Contents
loading

Table of Contents