Combustion-Air Intake - Carrier Infinity ICS 58MVC 100 Series Installation Instructions Manual

Direct vent 4-way multipoise condensing gas furnace
Hide thumbs Also See for Infinity ICS 58MVC 100 Series:
Table of Contents

Advertisement

COMBUSTION-AIR
INTAKE
(NON-DIRECT
VENT/1
ICATION)
_3-1N.
MINIMUM
CLEARANCE TO
' '
COMBUSTION-AIR
INTAKE IS REQUIRED _'_
_
(NON-DIRECT
VENT/1-PIPE
APPLICATION,)
ill
:II
COMBUSTION-AIR
PIPE
DIRECT VENT/2-PIPE
ALL SIZES)
3/8-1N. (10mm) ROD
ANGLE
IRON OR
EQU
(B)
(A) ROD LOCATION
USING DIMPLE
LOCATORS
(SEE DIMENSIONAL
DWG FOR
LOCATIONS)
3/8-1N. HEX
& WASHER (4)
REQD PER ROD
5 3/4' (146mm)
) (B) J
13/16-1N.(21mm) MAX
(B)
ALTERNATE SUPPORT
LOCATION FROM BACK
ALTERNATE SUPPORT
LOCATION 4-IN. (102mm) MIN
8-IN. (203mm) MAX
(A) PREFERRED
ROD LOCATION
(B) ALTERNATE ROD LOCATION
NOTES:
1. A 1 In. (25mm) clearance
minimum between
top of furnace and combustible
material.
2. The entire length of furnace must be
supported when furnace is used in horizontal
position to ensure proper drainage.
3. For non-direct vent/1 -pipe application,
bottom side combustion-air
entry cannot be
used when furnace is installed with hangers
as shown.
A93304
Fig. 23 - Crawlspace
Horizontal
Application
for Direct Vent / 2-Pipe
Installation
and for Ventilated
Combustion
Air Installation
20

Advertisement

Table of Contents
loading

Table of Contents