CONTINUED FRAMING AND INSTALLATION
Position Model 51ZC for installation as follows:
1. Thoroughly clean the area where the unit and hearth extension will be placed. Remove any carpet-
ing/padding from the area where the 51ZC will be installed.
2. Layout the location on the floor for the ZC cabinet .(See Page 7 Figure 5.)
3. Now place the Model 51ZC in desired location.
4. A sheet metal safety shield is placed 3" under the cabinet. It must extend out under the floor protec-
tor.
5. Now you are ready to install the chimney system for the 51ZC. If you are building an outside chase,
follow approved Chimney Manufacturer's instructions. If you are penetrating a ceiling, install the
chimney as follows:
a. Drop a plumb line, locate, and mark the point on the ceiling directly over the center of the 51ZC
chimney adapter.
b. After locating the center of the hole, install the firestop spacer per chimney manufacturer's
instructions.
6. Obtain the listed and approved chimney installation instructions and follow exactly.
a. Obtain the starter section of pipe and install on the 51ZC cabinet. It may be necessary to crimp
the inside of the starter pipe to ease installation into the 51ZC cabinet.
b. Obtain the two short sheet metal "ell" brackets and sheet metal screws provided with the 51ZC
and secure the starter section of pipe to the 51ZC cabinet.
Maintain a 2" minimum clearance.
Top Standoffs
CAUTION:
Maintain a 1-1/2"
air space between the rear and side
of cabinet to combustible materials.
c.
Continue adding lengths of chimney until you are ready to penetrate another ceiling or the roof.
d. Now, plumb bob the center of the ceiling or roof above the chimney and install another firestop
for another ceiling penetration or follow pipe manufacturer's instructions for attic and roof
penetration.
e. Once the roof penetration is made, install the flashing.
f.
Add applicable lengths of chimney, extending through the roof until the following conditions
are met:
FIGURE 10
Page 11
Install pipe by pushing down over
the starter section of pipe on the
51ZC Cabinet.
WARNING:
Do not pack
required air spaces on top of
cabinet or around pipe starter
section with insulation or other
materials.