New Buck Corporation 74 Manual page 32

Non-catalytic unit
Hide thumbs Also See for 74:
Table of Contents

Advertisement

2. After locating the center of the hole install the ceiling support box, chimney flashing and
rain cap. Only use2100° UL 103 HT chimney and parts listed in this manual per the chimney
manufactures instruction .
REFER TO CHIMNEY MANUFACTURER'S INSTRUCTIONS FOR ASSEMBLY AND
DISASSEMBLY OF CHIMNEY PARTS.
TIONS FOR PROPER CLEARANCES TO COMBUSTIBLE AND PROPER AIR SPACING
REQUIRED.
3. Add additional pipe until both of the following are met:
(a) Chimney pipe is 3 feet higher than roof at the point where it penetrates the roof.
(b) Chimney pipe height is at least 2 feet higher than any part of the roof within 10 feet of
the chimney. (See Figure 12A. Page 27.)
4. Using only double wall chimney connector listed in this manual (See Page 17), connect the
heater to the chimney by following chimney manufacturer's installation instructions
exactly. (See Figure 13.)
COLLAR
COLLAR
3 SHEET METAL SCREWS
3 SHEET METAL SCREWS
CAUTION
BE SURE TO FOLLOW CHIMNEY INSTRUC-
ROOF
CEILING
Figure 13
Page 28
3 SHEET METAL SCREWS OR RIVETS

Advertisement

Table of Contents
loading

Table of Contents