FRAMING CONSTRUCTION AND INSTALLATION
Except as noted, the 51ZC can be installed almost anywhere you desire. There are, however, a few clearance
and framing restrictions that must be followed. (See Page 10 Figure 9), and (Page 11 Figure10) to make sure
that these clearance restrictions are met. It is much wiser to place your Model 51ZC correctly at the start.
You must ensure that the floor is of adequate strength to accept the load of this unit. If inadequate, the floor
will require additional support, such as bracing. NOTE: A wooden base constructed of plywood or 2" x 4"
boards is required in order to get proper clearance above the extended hearth (millboard, rock stone, etc.).
Good planning is essential for a satisfactory installation, therefore, at this point you should have decided
where the 51ZC is to be located and the route the chimney will follow to the roof-straight up, or chase. If
you cannot decide the best route, contact your Dealer for assistance with the planning.
Above (Figure 5) are framing location examples with depth dimensions for some typical configurations.
These are finished measurements so install accordingly.
26"
ADJACENT ROOM OF
EXTERIOR CHASE
FIGURE 5