4 Replacement Procedures
Installing the Switch Board
Install the switch board according to the following procedures and Figures 4-12.
1. Seat the switch board in the correct position.
2. Connect the switch board flat cables to CN1 on the switch board.
4-26
Satellite M200/M205 / Satellite Pro M200/ EQUIUM M200/ SATEGO M200
4.5 Switch Board
Maintenance Manual