Toshiba Satellite M205 Maintenance Manual page 111

Hide thumbs Also See for Satellite M205:
Table of Contents

Advertisement

3.10 Peripheral
If press Ctrl+Break to force the test to terminate during execution of VESA
Video Memory, the test program will not operate and display properly in further
tests.
Subtest 05
AGP Test
This test item is to report the system's Accelerated Graphics Port status and check
whether AGP registers works normally.
Subtest 06
LCD Panel Test
This test item is to check whether there is any fault in its resolution by displaying
the RGB gradient color screens.
Satellite M200/M205, Satellite Pro M200, EQUIUE M200, SATEGO M200 Maintenance Manual
3 Diagnostic Programs
49

Advertisement

Table of Contents
loading

This manual is also suitable for:

Satellite m200Satellite pro m200

Table of Contents