7-4-8.CONTROL.BOX.ASSY
Refer to Section 7-5 for disassembly, checking and reassembly procedures of the control panel .
(1) Put the cover onto the frame temporary .
NOTE : Don't set bolt for the control box.
(2) Pass wires drawn out generator and engine
to the control box .
(3) Connect the wires coming from the control
panel with wires coming from generator and
engine .
NOTE : Connect the wires of the same color.
(4) Install the control panel onto the control box .
M4 × 12 mm Screw . . . 4 pcs .
Tightening.torque.:.. . 5.0-6.0.
(5) Mount the control panel together with the
control box (Control box Assembly) onto the
frame .
M6 × 12 mm Screw . . . 4 pcs .
Tightening.torque.:.. . 5.0-6.0.
N•m.
.50-60.
kgf•cm.
.(3.7-4.8. ft•lbs)
N•m.
.50-60.
kgf•cm.
.(3.7-4.8. ft•lbs)
CONTROL BOX
CONTROL PANEL
M4
M6
- 47 -