About Automatic Circuit Protection; Adding A 2-Station Expansion Module - Toro TMC-212 User Manual

Residential and commercial irrigation system controller
Hide thumbs Also See for TMC-212:
Table of Contents

Advertisement

373-0319 TCM 212 Doc2
12/20/04

About Automatic Circuit Protection

The TMC-212 features built-in circuit protection to help
prevent damage to the controller caused by excessive
current draw on the station and/or pump/master valve cir-
cuits.
If the controller detects an over-
load condition on a station, it will
bypass the affected station(s) and
display the word FUSE with the
affected station number(s). All remaining stations will
operate as programmed for automatic operation.
If the condition occurs on the
pump/master valve circuit, the
controller will alternately display
MV and FUSE and discontinue
the program operation.
To clear the warning display,
press the –/
button . The controller will continue to
OFF
operate as scheduled and will attempt to run all stations
as programmed.
IMPORTANT: Clearing the display does not correct
the problem. The controller will continue to bypass the
affected station(s) or discontinue operation until the
overload condition is eliminated.
Before continuing to operate the controller, identify and
remove the source of the problem. In most cases, this
condition is caused by a faulty valve solenoid, pump start
relay and/or shorted wire splice.
12:30 PM
Page 37

Adding a 2-Station Expansion Module

Note: Expansion modules are available in two versions:
TSM-02 Standard-surge module and TSM-02-H High-
surge module. Either module type can be used in any
TMC-212 controller model, however, the TSM-02-H
module will only provide additional surge protection
when installed in outdoor high-surge controller models
DELAY
1. Turn the control dial to the
2. Remove the access cover.
3. Place the back of the station module squarely
4. To connect the valve wires, refer to "Connecting The
5. Reinstall access cover.
6. To set the station time, refer to "Setting Station
7. To test the operation of the added station(s), refer to
24HR
1
2
3
4
OFF
between the guides of the first open expansion slot
(from left to right). Pushing lightly on the bottom of the
module, slide it upward until it locks into position.