Napoleon BGD36CFNTR Installation And Operating Instructions Manual page 24

Napoleon gas fireplaces - installation and operating instructions

Advertisement

4
USING FLEXIbLE VENT COMPONENTS
the BGD36CF USeS: 4" eXhAUSt / 7" AIR INtAKe veNt PIPe
the BGD42CF USeS: 5" eXhAUSt / 8" AIR INtAKe veNt PIPe
Use only approved aluminum flexible liner kits
marked:
FIGURE 50
HORIzONTAL AIR TERMINAL INSTALLATION
1. Cut or frame a hole in an exterior wall with a mini-
mum opening of (9.5" x 0.5" BGD6CF) or (0.5" x .5"
BGD42CF). Secure the firestop spacer over the opening to
the interior wall.
2. Stretch the exhaust to the required length taking into
account the additional length needed for the finished wall
surface. Slip the liner a minimum of " over the inner sleeve
of the air terminal and secure with  #8 screws. Apply a heavy
bead of the high temperature sealant (not supplied).
3. Using the air intake vent pipe, slide over the outer com-
bustion air sleeve of the air terminal and secure with  #8
screws. Seal as before.
FIGURE 51
SCREWS
the air terminal mounting plate may be recessed into
the exterior wall or siding by 1½", the depth of the return
flange.
HI-TEMP
SEALER
AIR INTAKE
VENT PIPE
4. Insert the liners through the firestop maintaining the
required clearance to combustibles. Holding the air terminal
(lettering in an upright, readable position), secure to the ex-
terior wall and make weather tight by sealing with caulking
(not supplied).
W45-0566 / A / 07..06
2" OVERLAP
#10 X 2"
FIGURE 52
#8 X 1/2"
SELF DRILLING
SCREWS & WASHERS
COUPLER
COUPLER
AIR INTAKE
VENT PIPE
EXHAUST
5. Apply a heavy bead of the high temperature sealant to
the inside of the exhaust approximately " from the end. Slip
the liner a minimum of 2" over the fireplace vent collar and
secure with  #8 screws.
6. Using the air intake vent pipe, apply sealant, slide a
minimum of 2" over the fireplace combustion air collar and
secure with  #8 screws.
7. If more liner needs to be used to reach the fireplace,
couple them together as illustrated. The vent system must
be supported approximately every  feet for both vertical and
horizontal runs. Use noncombustible strapping to maintain the
minimum " clearance to combustibles.
8. BGd42cF ONly:
The heat sheild must be
installed only when ter-
minating horizontally with
no vertical rise. Remove
the two screws nearest
the vent collars on the top
of the fireplace. Align the
vent heat shild (supplied)
and secure.
VERTICAL AIR TERMINAL INSTALLATION
FIGURE 54
2. Stretch the exhaust to the
required length. Slip the liner a mini-
mum of " over the inner sleeve of
the air terminal and secure with  #8
screws. Seal using a heavy bead of
the high temperature sealant.
3. Repeat using air intake vent
pipe.
4. Thread the air terminal pipe
assembly down through the roof.
The air terminal must be located
vertically and plumb. Attach the air
terminal assembly to the roof sup-
port, ensuring that a minimum 6" of air terminal will penetrate
the roof when fastened.
DO NOt CLAmP the FLeXIBLe ALUmINIUm LINeR.
FIGURE 53
VENT
HEAT
SHIELD
SCREWS
1. Fasten the roof sup-
port to the roof using the
screws provided. The
roof support is optional.
In this case the venting
is to be adequately sup-
ported using either an
alternate method suitable
to the authority having
jurisdiction or the optional
roof support.
INNER
SLEEVE
FIGURE 55
AIR
TERMINAL
CONNECTOR
HIGH
TEMPERATURE
SEALANT
EXHAUST
AIR INTAKE
VENT PIPE