Test Commands - Paradyne 3162 User Manual

Hewlett-packard acculink dsu / csu user's guide 3162
Hide thumbs Also See for 3162:
Table of Contents

Advertisement

Monitoring and Testing

Test Commands

5-18
Table 5-9. Test Jack Functions
Test Jack Name
Function
NET In
A break-in test jack that allows a signal to be inserted toward the
(Network In)
network by external test equipment.
NET Out
A break-in test jack that interrupts the signal coming from the
(Network Out)
network and allows it to be terminated by the external test
equipment.
EQPT In
A break-in test jack that allows a signal to be inserted toward the
(Equipment In)
terminal equipment (DTE) by external test equipment.
EQPT Out
A break-in test jack that interrupts the signal coming from the
(Equipment Out)
terminal equipment (DTE) and allows it to be terminated by the
external test equipment.
MON In
A monitor jack that is controlled by the Selectable Test Jack branch
(Monitor In)
of the menu tree. If it is set to Equipment (the default), this jack
monitors the signal going into the terminal equipment (DTE). If it is
set to Network, this jack monitors the signal going into the network.
MON Out
A monitor jack that is controlled by the Selectable Test Jack branch
(Monitor Out)
of the menu tree. If it is set to Equipment (the default), this jack
monitors the signal coming from the terminal equipment (DTE). If it
is set to Network, this jack monitors the signal coming from the
network.
The test commands enable you to run loopbacks and test patterns on the
DSU/CSU, and to test the front panel LEDs. These tests can help you isolate
areas of trouble if you are having problems with your DSU/CSU.
Use the Test branch of the asynchronous terminal menu tree (see
access all test commands.
August 2000
Appendix
A) to
3162-A2-GB20-40

Advertisement

Table of Contents
loading

Table of Contents