Installing A Psu; Turn On The Switch - Avaya C460 Quick Start Manual

Modular multilayer switch
Hide thumbs Also See for C460:
Table of Contents

Advertisement

Installing a PSU

Caution: Do not leave any PSU slots open. Use the blanking plates supplied to cover empty
slots.
In order to support Power over Ethernet, you need to install MPS4610-AC 1000W PSUs
Use the handle on the front panel of the PSU to lift it.
You can install the PSU in any of the three slots.
1
Remove the blanking plate by unscrewing the four retaining screws and gently tugging the
plate towards you.
2
Position the PSU with the label facing up and to the right.
3
Gently slide the PSU back until the socket on the back of the PSU engages in the plug on the
chassis.
Ensure the guiding pins on the front panel of the PSU align with the holes on the front
panel of the C460 chassis.
4
Gently tighten the screws on the PSU.

Turn on the Switch

Once you have installed the supervisor module and PSU, you can turn on the switch:
1
Connect the PSU to the electricity supply.
2
Set the rocker switch on the front panel of the PSU to "I" to turn the switch on.
The LED on the front panel of the PSU is lit green.
4
The fans start
The boot process starts:
Stage
1
2
3
If you have installed two supervisor modules, the boot process is as follows:
Stage
1
2
3
*Supervisor in "halted" mode
Refer to the Avaya C460 Installation and Maintenance Guide for further information.
The C460 is now ready for operation with its default settings (see Table 12, "Default
System Parameters"). If you wish to configure the switch, see "Configure the Switch".
PWR LED
ON
Flashes for about 50 seconds
ON
ON
Active supervisor module
PWR LED
OPR LED
ON
Flashes for
about 50
ON
seconds
ON
ON
OPR LED
ON after about 30 seconds
ON
Second supervisor module
ACT LED
PWR LED
OFF
ON
ON after
ON
about 30
ON
seconds
ACT LED
OFF
OPR LED
ACT LED
Flashes for
OFF
about 50
ON after
seconds
about 30
ON
seconds
Flashes*
.

Advertisement

Table of Contents
loading

Table of Contents