Placing the heating system in operation
9.6

Start-up protocol

Please check off the start-up work as it is completed and
record the measured values in the table.
Start-up work
1.
Type of gas
2.
Check combustion air, inlet and outlet openings and
flue gas connection
3.
Check the unit fittings (correct orifices?,
below) and convert gas type if necessary
4.
Fill boiler with water and bleed complete heating system
5.
Measure gas pressure (supply pressure)
6.
Measure manifold pressure and adjust if necessary
7.
Leak check in operating status, check pilot and main burner flame and
correct functioning of the venting system
8.
Check maximum aquastat
9.
Install front boiler panel
10.
Inform operator, hand over technical documentation
11.
Installer
Operator:
Boiler size
Natural gas
265
Propane gas
175
Tab. 14 Main gas orifice identification
USER NOTE
Inform the customer of the correct fuel
and enter it in the table (
manual of boiler).
46
Installation and maintenance instructions Logano GA124 special gas-fired boiler • Issue 04/2005
Tab. 14
Main gas orifice identification
17
23
250
160
operating
Remarks or measured values
Natural gas
–––––––––––––––––––
–––––––––––––––––––
Signature:__________________
Signature:__________________
30
250
160
We reserve the right to make any changes due to technical modifications.
Propane
inches W. C.
inches W. C.