Lifting And Carrying The Boiler - Buderus Logano GA124 Installation And Maintenance Instructions Manual

Sealed combustion gas boiler
Hide thumbs Also See for Logano GA124:
Table of Contents

Advertisement

Moving the boiler
Remove the straps and the cardboard packaging.
Remove the bolts from the pallet.
Lift the boiler at the sides and slide to the edge of the
pallet. Place a pipe under the boiler and roll it on
additional pipes to the installation location.
Place the boiler in its final position.
5.2

Lifting and carrying the boiler

The boiler can be picked up at the hand grips shown.
RISK OF INJURY
due to carrying heavy loads.
Lift and carry the boiler with at least four
CAUTION!
people at the designated hand grip
positions.
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano GA124 special gas-fired boiler • Issue 04/2005
Fig. 5
Moving the boiler
Fig. 6
Lifting and carrying the boiler
5
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents