A
Analog meter connections, 44
Analog mode, 7, 10, 13, 21
Angle mounting bracket, 23
B
Barriers, 40
Battery pack, SFC
Installing and charging, 20
Bench check, 5
Blow-down lines, 34, 37
Bracket mounting
Horizontal pipe, 24
Vertical pipe, 24
C
Capillary tubes, 32
Checking ST 3000 shipment, 2
Communications, 7
Communicating with the ST 3000, 4
Testing, 7
Conduit seal, 43
D
Digital (DE) mode, 7, 13, 21
Dimensions, 24
E
Electronics housing. See Transmitter housing
Electronics module, PWA, 13
Enclosure ratings, 93
F
Failsafe action, 13
Failsafe direction, 13
change, 13
Failsafe jumper, 13
Fill-fluid, 18
Fill-fluids, 32
Flange adapter, 34
Installing, 38
Flange connections, 37
Extended, 37
Flush, 37
2/05
Index
Flange mounted, 23
Flat mounting bracket, 23
Flow engineering units
Flush mounted transmitter, 30
Ground
Ground terminal, 39
Hazardous locations reference, 82
Leveling an absolute pressure transmitter, 27
Lightning Protection, 42
Local Smart Meter
Local Zero and Span
Loop resistance, 39
Loop wiring, 44
Model designations, 2
Mounting locations
Output conformity and smart meter configuration, 58
Overpressure ratings, 19
Piping for a 1/2" NPT process connection, 35
Piping guidelines, 37
Potential noise sources, 17
Power supply, 5
Power supply voltage, 21, 39
Pressure ratings, 19
Process characteristics, 17
Process connections, 36
ST 3000 Release 300 Installation Guide
Smart meter, 58
G
External ground, 42
H
IEC Classifications, 88
North American Classifications, 82
L
Setting display of LRV (using meter pushbuttons), 62
Adjusting (Procedure), 53
M
Suggested, 35
O
P
connecting, 5
95