One Stop Gardens 93358 Owner's Manual page 13

Greenhouse
Table of Contents

Advertisement

Phase 4b: Ceiling Plate Assembly, Side
13
13
13
1. Insert a Plain Side Ceiling Plate (13) in the brackets
on the end of a Side Ceiling Plate with Brackets (12).
2. Secure in place with 6 Normal Bolts (65)
and 6 Nuts (67). The heads of the Bolts
should all face the gutter side of the Ceiling
Plates, as shown in the inset above.
Item 93358
12
12
12
For technical questions, please call 1-800-444-3353.
12
3. Repeat the two previous steps for the
remaining Plain Side Ceiling Plate (13) and
Side Ceiling Plate with Brackets (12).
4. Attach an End Cap (72) to the top outer corner
of each Corner Post (7) at this point.
Parts in this phase
are fastened using
a total of
12 Normal Bolts (65)
and 12 Nuts (67).
13
Page 13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents