Scheduling - Trane Thermostats Installation And Operation Manual

Standard and programmable versions
Hide thumbs Also See for Thermostats:
Table of Contents

Advertisement

Operation

Scheduling

The thermostat can be configured for two periods (day and night) or four periods (morning, day,
evening, and night).The chosen number of periods are applied to each day of the week when you
program the thermostat. Each period can have a unique start time, heat setpoint, cool setpoint, and
fan setting.
The groups of days can be one of the following:
Note: See
If needed, you can use
the schedule.The default schedule is also shown in the table. Unless you program your own
schedule settings, the thermostat follows the default schedule for all days of the week.
36
1 day = all 7 days of the week follow the same schedule.
5+1+1 days = Monday - Friday all follow the same schedule; Saturday and Sunday each follow
their own schedules.
5+2 days = Monday - Friday all follow the same schedule; Saturday and Sunday follow the same
schedule, which is different than the Monday - Friday schedule.
7 days = Each day follows its own schedule.
"Configuration, " p. 26
in the schedule.
Table 9
to change the number of periods in a day or the grouping of days
to write down your schedule settings before you begin setting up
BAS-SVX36C-EN

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

X13511535-01X13511536-01X13511537-011h/1c3h/2c

Table of Contents