Field Wiring Control Box Compartment - 230 V, 50 Hz; Connect Control Box - 230 V, 50 Hz - Kohler K-1200-AC Installation Instructions Manual

Builder portfolio whirlpool baths
Table of Contents

Advertisement

E. FIELD WIRING CONTROL BOX
COMPARTMENT - 230 V, 50 HZ
WARNING: Risk of electrical shock. Make sure
the power has been disconnected before
performing the following procedures. Refer to
Important Safety Instructions located on page 2.
CAUTION: Risk of electrical shock. All services
must have an Earth Leakage Circuit Breaker
(ELCB) which will provide additional protection
against line-to-ground shock hazard. A separate
service is required for the whirlpool.
The whirlpool controls and system have been prewired
at the factory. A licensed electrician should make a
routine
service
connection
compartment of the control box containing blue and
brown wires and earth lug.
* For bonding in accordance with National and Local
Codes.
F. CONNECT CONTROL BOX - 230 V, 50 HZ
Connect service to the field wiring compartment of the
control box. The 50 Hz model control box contains blue
and brown wires and earth lug.
A 230 V, 15 A, 50 Hz dedicated circuit is required.
Provide an Earth Leakage Circuit Breaker.
Provide a separate equipment earthing conductor for the
inside earth lug. The earthing conductor must not be
connected to any current carrying conductor. Follow
local electrical codes. A 230 V, 15A, 50 Hz separate
circuit is required.
Kohler Co., Kohler WI
to
the
field
wiring
Pump
19
Air
Actuator
Control
Box
Air
Actuator
Tube
Blue
Neutral
(Neutral)
Brown
(Phase)
Wire Connectors
Field Wiring
Compartment
Bonding
(Earthing) Lug*
Earth
(Ground) Lug
Earth
(Ground)
Phase (Line)
Earthing Lug (for
bonding in accor-
dance with national
and local codes)
CA
106548-
(9437)

Advertisement

Table of Contents
loading

Table of Contents