Brocade Communications Systems Brocade 8/12c Administrator's Manual page 259

Supporting hp secure key manager (skm) environments and hp enterprise secure key manager (eskm) environments
Hide thumbs Also See for Brocade 8/12c:
Table of Contents

Advertisement

2. Reclaim the WWN base of BES3.
3. Synchronize the crypto configurations across all member nodes.
When BES3 has not failed, complete the following steps:
1. From the group leader, enter the following command to reclaim the VI/VT WWN base for the
2. From the group leader, enter the following command to propagate the change to all nodes in
3. Enter the following command in BES1 to eject node BES3 from the encryption group:
4. Enter the following command on BES1 to deregister the ejected node from the encryption
5. Execute the following command on the BES3:
6. Replace the old Brocade Encryption Switch with the new Brocade Encryption Switch and
7.
8. Power on the new Brocade Encryption Switch.
Fabric OS Encryption Administrator's Guide
53-1002159-03
cryptocfg --reclaimWWN –membernode <switchWWN> [-list]
cryptocfg –-commit
NOTE
When attempting to reclaim a failed Brocade Encryption Switch, do not execute
cryptocfg –-transabort
node to be removed.
cryptocfg --reclaimWWN -membernode <BES3-WWN>
When prompted, enter Yes.
NOTE
Do not use the above command with the
the encryption group.
cryptocfg --commit
cryptocfg --eject -membernode <BES3-WWN>
group:
cryptocfg --dereg -membernode <BES3-WWN>
cryptocfg --reclaimWWN -cleanup
reattach the IO Link cables and Mgmt Link. Connect the IO sync ports to the same private LAN
as the IO sync port of the failed node.
Run the following command on the ejected member node:
cryptocfg --reclaimWWN -cleanup
NOTE
Do not reconnect the FC cables yet.
BES removal and replacement
. Doing so will cause subsequent reclaim attempts to fail.
option between steps 1 and 4.
-list
6
239

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fabric os encryption

Table of Contents