Gas Connections - Teledyne 7320 Operating Instructions Manual

Infrared gas analyzer
Table of Contents

Advertisement

1 Introduction
Remote Valves
Remote Sensor
Remote Span/Zero
Calibration Contact
Range ID Contacts
Network I/O
1.9

Gas Connections

The gas connectors are on the bottom of the Model 7320 chassis near
the front door.
A sample system must be provided for introduction of zero and span
gas, as well as sample gas, into the sample path, and for controlling the
flowrates through the sample and reference paths of the analyzer. Appropri-
ate pressure reducing regulators must be installed at all gas supply sources.
Gas Connector-and-Selector Panels for specific applications are avail-
able at additional cost. These panels are optional designed to substitute a
standard front panel.
For those customers wishing to incorporate their own sample controls,
the recommended system piping schematic is included among the drawings
at the rear of the manual.
1-6
Used for controlling external solenoid
valves, if desired.
Used for external sensor and
thermocouple, if desired.
Digital inputs allow external control of
analyzer calibration.
To notify external equipment that
instrument is being calibrated and
readings are not monitoring sample.
Four separate, dedicated, range relay
contacts. Low, Medium, High, Cal.
Serial digital communications for local
network access. For future expansion.
Not implemented at this printing.
Teledyne Analytical Instruments
Model 7320

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents