Installation Checklist - Teledyne 2120 Operating Instructions Manual

Trace nitrogen in argon analyzer
Table of Contents

Advertisement

Trace Nitrogen in Argon Analyzer
settings supplied. If the settings do not match, the instrument should be
recalibrated prior to using for the first time.
Calibration procedures require an understanding of how to operate
the instrument which is discussed in Section 4 of this manual. Refer to
Section 4.2 for calibration procedures after reading the entire section on
operating the instrument (Section 4).

3.8 Installation Checklist

After installing the system, and prior to powering up the system,
verify the following items:
1. Each gas line has been purged for at least 1 hour prior to
connection to the analyzer inlets.
2. There are no leaks at the sample inlet gas connection to the
instrument.
3. There are no leaks between the span gas cylinder and the
analyzer span gas inlet port when span gas is flowing to the
analyzer.
4. There are no leaks between the zero gas source and the
analyzer zero gas inlet port when zero gas is flowing to the
analyzer.
5. The vent tube connection has no leaks, has an unobstructed
path to atmosphere, and is at least 1/4-in (0.64-cm) OD.
6. All electrical connections have been made properly and the
Power Entry module is set for the appropriate power from your
facility.
Teledyne Analytical Instruments
Installation
27

Advertisement

Table of Contents
loading

Table of Contents