Installation; Unpacking The Instrument; Model - Teledyne 2120 Operating Instructions Manual

Trace nitrogen in argon analyzer
Table of Contents

Advertisement

Trace Nitrogen in Argon Analyzer

Installation

Installation of the Model 2120 Trace Nitrogen in Argon Analyzer
can involve potentially hazardous procedures.
CAUTION:
INSTALLATION SHOULD BE PERFORMED ONLY BY
TRAINED AND QUALIFIED PERSONNEL WHO HAVE
READ AND UNDERSTOOD THE INSTRUCTIONS IN
THIS MANUAL.
Installation of the Model 2120 Trace Nitrogen in Argon Analyzer
includes:
Unpacking
Choosing an Appropriate Location
Mounting
Electrical connections
Gas connections
Purging
Calibration

3.1 Unpacking the Instrument

The analyzer is shipped with all the materials you need to install
and prepare the system for operation. Carefully remove the analyzer from
the shipping container and visually inspect it for damage. Maintain it in an
upright position and avoid jarring. Ensure the power cord and calibration
data sheets are included and that all components ordered have been
supplied.
If any items are missing or the analyzer appears damaged,
immediately report any damage to the shipping agent and notify
Teledyne. Remove and discard caps from fittings; inspect the analyzer
for loose fittings or connections.
Teledyne Analytical Instruments
Installation
19

Advertisement

Table of Contents
loading

Table of Contents