2. CONNECTING THE CORD
WARNING :
Turn OFF the power and start the work after 5 minutes or more have passed so as to prevent
accidents caused by abrupt start of the sewing machine.
) Pass cord 1 and FG cord 3 (for type C) of the
operation panel through hole A in the machine
tabletorouteittotheundersideofthetable.
3
4
3) For type C, fix FG cord 3 tothepowerswitchwithwoodscrew 4 suppliedwiththepanelasaccessories.
WireFGcord 3 afterbundlingitwiththepowercableandthelikewithcableclipband 5 suppliedwith
thepanelasaccessories.
A
1
3
2
2) Connect the connector of cord 1 to connector
CN34 2 in the control box.
Bottom surface of table
5
–2–
1