Installation Kits Contents; Preparation Of Chassis - Goldstar RI000 Owner's Manual

10/12/14/18/24k series
Table of Contents

Advertisement

[] Installation Kits Contents
NO.
NAME OF PARTS
Q'TY
1
FRAME CURTAIN
2
2
SILL SUPPORT
2
3
BOLT
2
4
NUT
2
5
SCREW(TYPE
A}
16
6
SCREW(TYPE B)
3
7
SCREW(TYPE C)
5
8
FOAM-STR]P
1
9
UPPER GUIDE
1
I 0
FOAMoPE
1
11
FRAME GUIDE
2
I 2
WINDOWLOCKING8RACKET
1
13
FOAM-PE
1
14
DRAIN JOINT PIPE
1
15
DRAIN WASHER
1
[] Suggest_
Tool Requirements
SCREWDRIVER(+, -), RULER:, KNIFE, HAMMER, PENCIL, LEVEL
PREPARATION OF CHASSIS
,
Remove
the screws which fasten the cabinet
at both sides and at the back,
Slide the unit from the cabinet by gripping the
base pan handie and pulling forward while
bracing the cabinet,
Shipping
I
,
,
Cut the window
sash seal to the proper
length,
Peel off the backing
and attach the foam pe
@ to the underside
of the window sash.
Remove
the backing from the top upper gu:[de
Foam PE ,:!0: a nd a_ach it to the bottom of the
upper guide ,_.
5, Attach the upper guide onto the top of the
cabinet with 3 type A screw&
6_
.
Insert the frame guides
@ into the bosom of
the cabinet,
Insert the Frame Curtain
,:_;, i nto the upper
guide, ,:197 and frame, guides :f1_,
(Type A)
8. Fasten the curtains
to the unit with 4 Type
A screws.
(Type A)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents