Suggested Tool Requirements - Goldstar RI000 Owner's Manual

10/12/14/18/24k series
Table of Contents

Advertisement

[] INSTALLATION KITS CONTENTS
NO,
NAME OF PARTS
Q'TY
1
FRAME CU RTAH_
2
2
SILL SUPPORT
2
3
BOLT
2
4
NUT
2
5
6
7
8
9
10
11
12
13
14
15
SCREW(TYPE
B)
SCREW(TYPE
C)
FOAM-STRIP
FOAMoPE
UPPER GUIDE
FOAM-PE
FRAME GUIDE
WINDOW LOCKING BRACKET
DRAIN JOINT PIPE
DRAIN WASHER
16
3
5
1
1
1
1
2
1
1
1
[] SUGGESTED TOOL REQUIREMENTS
I SCREWDRIVER(,,-),
RULLER,
KNIFE, HAMMER,
PENCIL, LEVEL I
PREPARATION
OF CHASSIS
1. Remove the screws which fasten the cabinet at
both sides and at the back.
2. Slide the unit from the cabinet by gripping the
basie pan handle and pulling forward while
bracing the cabinet.
3, Remove
EPS Material.
4, Cut the window sash seal to the proper length.
Peel off the backing and attach the foam-pe
_9_
to the underside
of the window sash.
5. Remove the backing from the top upper guide
Foam PE _-i!;, and attach it to the bottom of the
upper guide ,:_:,,
6, Attach the upper guide onto the top of the
cabinet with 3 type A screws,
7. Insert the frame guides
,,:i_into the bottom of the
cabinet.
8. Insert the Frame Curtain
J_iinto the upper guide
_#;_ a nd frame guides ®.
9, Fasten the curtains
to the unit with 4 Type A
screws.
Shipping
screws
EPS Maledal
(Type A)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents