Goldstar RI000 Owner's Manual page 25

10/12/14/18/24k series
Table of Contents

Advertisement

[] Suggested Tool R_uirements
SCREWDRIVER(+,,-),
RULER, KNIFE, HAMMER,
PENCIL, LEVEL
PREPARATION OF CHASSIS
1. Remove the screws which fasten the cabinet at:
both sides and at the back
2, Slide the unit out from the cabinet by gripping the
base pan handle
and pulling
forward
while
bracing the cabinet.
3. Cut: the window sash seal to the proper length.
Peel off the backing and attach the Foam-PE to
the underside of the window sash.
Shipping scows
4. Remove the backing from Foam-PE with 3 holes
and attach it to the bottom of the Top retainer
bar_
5. Attach the Top retainer bar on the top of the
cabinet with 3 screws (Type A).
Fig, 2
6. insert the Frame guides into the bottom of the
cabinet.
7. Insert the Frame Curtain into the Top retainer bar
and Frame guides.
8. Fasten the curtains to the unit with 10 _rews
(Type A) at both sides.
Top retainer bar
Foam-PE
Top retair_r b_
Screw
(Type A)
"-Frame g ui_
Screw(Type A)
Fig. 4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents