Installation Kits Contents; Suggested Tool Requirements; Preparation Of Chassis - Goldstar R8000 Owner's Manual

Lg
Table of Contents

Advertisement

Installation Kits Contents
NO.
NAME OF PARTS
Q'TY
1
FRAME CURTAIN
2
2
SILL SUPPORT
2
3
BOLT
2
4
NUT
2
5
SCREW(TYPE A)
16
6
SCREW(TYPE B)
3
7
SCREW(TYPE C)
5
8
FOAM-STRIP
1
9
UPPER GUIDE
1
10
FOAM-PE
1
11
FRAME GUIDE
2
12
WINDOW LOCKING BRACKET
1
13
FOAM-PE
1
Suggested Tool Requirements
PREPARATION OF CHASSIS
1. Remove the screws which fasten the cabinet
at both sides and at the back.
2. Slide the unit from the cabinet by gripping the
base pan handle and pulling forward while
bracing the cabinet.
SCREWDRIVER(+,-), RULER, KNIFE, HAMMER, PENCIL, LEVEL
Shipping
---__Screws
3. Cut the window sash seal to the proper
length.
Peel off the backing and attach the foam-pe
(_ to the underside of the window sash.
4. Remove the backing from the top upper guide
Foam PE (_ and attach it to the bottom of the
upper guide (_).
5. Attach the upper guide onto the top of the
cabinet with 3 type A screws.
6. Insert the frame guides _!])into the bottom of
the cabinet.
7. Insert the Frame Curtain _ into the upper
guide (_)and frame guides tj]).
(Type A)
8. Fasten the curtains to the unit with 4 Type
A screws.

Advertisement

Table of Contents
loading

This manual is also suitable for:

R1003

Table of Contents