Nortel 1000 Installation And Commissioning Manual page 65

Isdn basic rate interface installation and commissioning
Table of Contents

Advertisement

Connecting the ISDN BRI terminals (for line applications)
For line applications, five procedures are required to connect ISDN BRI
terminals to the system:
Step
1
2
3
4
5
Figure 19 "Connecting ISDN BRI terminals to the system" (page 66)
a typical DSL and multiple ISDN BRI terminals connected to the system.
Copyright © 2003-2007, Nortel Networks
.
Action
Connect system cables to the cross-connect terminal. See
Procedure 20 "Connecting system cables to the cross-connect
terminal" (page
66).
Cross-connect the DSLs at the cross-connect terminal. See
Procedure 21 "Cross-connecting the DSLs at the cross-connect
terminal" (page
70).
Connect the terminating resistor to the SILC DSL. See
"Connecting the terminating resistor to the SILC DSL" (page
Connect the ISDN BRI terminals to the DSL. See
"Connecting the ISDN BRI terminals to the DSL" (page
Initialize the terminals. See
Networks M5317TDX terminal" (page
Nortel Communication Server 1000
ISDN Basic Rate Interface Installation and Commissioning
NN43001-318 01.02 Standard
Release 5.0 20 June 2007
Installation procedures 65
Procedure 24 "Initializing a Nortel
80).
—End—
Procedure 22
74).
Procedure 23
76).
shows

Advertisement

Table of Contents
loading

This manual is also suitable for:

Communication server 1000Cs 1000

Table of Contents