Installation - Toro Sand Pro 2020 Service Manual

Hide thumbs Also See for Sand Pro 2020:
Table of Contents

Advertisement

5. Disconnect air hose from the air cleaner. Remove
lower shroud from the cooler mount to prevent damage
to the fan when removing the hydrostat.
6. Disconnect control rod from pump lever and wires
from the neutral switch (Fig. 36).
7. Loosen both set screws (11) on the pump hub (19)
enough to allow the hydrostat shaft to be released.
8. Clamp hydraulic hose (35) and hydraulic hose (25)
to prevent draining of the tank. Disconnect all six hy-
draulic hoses from fittings on the hydrostat. Allow hoses
to drain into a suitable container.
9. Remove self tapping screw securing R–clamp and
fuel hose to the frame (Fig. 37)
CAUTION
One person should operate the chain fall or hoist
while the other person guides the engine from
the frame.
IMPORTANT: When moving the engine and hydros-
tat from the frame, make sure not the damage the
cooling fan, wires, hoses, and cables.
10. Reposition hydrostat and engine as follows:
A. Position a jack or chain fall to the engine base
(Fig. 39).
B. Remove lock nuts, flat washers, and cap screws
securing both front engine mounts to the frame
(Fig. 38).
C. Remove cap screws and flat washers securing
the engine support the the frame (Fig. 39).
D. Lower and pull back hydrostat and engine from
the cooler mount so the cooling fan is clear of the
mount.
11. Separate hydrostat from the engine base by remov-
ing both lock nuts and socket head screws.
12. Remove fan hub (27) with cooling fan (28) and
woodruff key (9) from the hydrostat shaft.
13. Match mark position of all hydraulic fittings on the
hydrostat. Remove all hydraulic fittings and O–rings
from the hydrostat. Plug or cap all ports to prevent con-
tamination.
14. Remove cap screw and lock nut securing the pump
lever to the hydrostat trunnion. Remove three cap
screws securing the pump plate to the hydrostat while
pulling the pump plate from the hydrostat (Fig. 36).
Sand Pro 2020/3020/5020
1
4
2
1. Blue wire (magneto)
2. Blue wire (voltage reg.)
5
1. Positive cable (solenoid)
2. Starter
3. Lock nut and cap screw
3
1
1.
Control rod
2.
Pump lever
3.
Wires
Installation (Fig. 33)
1. Make sure hydraulic hoses, fittings, and tubes are
cleaned thoroughly.
2. Securing pump plate to the hydrostat with three cap
screws. Secure pump lever to the hydrostat trunnion
with cap screw and lock nut (Fig. 36).
Page 4 – 45
Figure 34
3. Voltage regulator
4. Red/white wire
1
2
4
Figure 35
4. Battery cable (negative)
5. Ground wire (frame)
4
2
Figure 36
4.
Neutral switch
5.
Pump plate
Hydraulic System (Rev. A)
3
3
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sand pro 3020Sand pro 5020

Table of Contents