3-11.Placing Jumper Links And Connecting Input Power - Miller Electric SYNCROWAVE 250 Technical Manual

Arc welding power source
Table of Contents

Advertisement

3-11. Placing Jumper Links And Connecting Input Power
200 VOLTS
L
230 VOLTS
L
L
220 VOLTS
L
L
260 VOLTS
L
L
Tools Needed:
3/8 in
3/8, 1/2, 7/16 in
TM-353 Page 12
230 VOLTS
L
L
L
460 VOLTS
L
L
380 VOLTS
L
L
380 VOLTS
L
L
1
Connect GND/PE
Conductor First
460 VOLTS
L
L
S-083 566-C
575 VOLTS
L
L
S-010 587-B
415 VOLTS
L
L
S-131 783-A
520 VOLTS
L
L
S-047 672-A
Connect GND/PE
Conductor First
Check input voltage available at
site.
1
Jumper Link Label
Check label inside your unit–
only one label is on unit.
Y Only make connections for
the voltages shown on the la-
bel inside your unit. Do not
make connections for any
other voltages. If jumper link
label is missing from inside
unit, check rating label (see
2
Section 3-4) for allowable in-
put voltages.
2
Jumper Links
Move jumper links to match input
voltage.
3
Input And Grounding
Conductors
Select size and length using
Section 3-10.
4
Line Disconnect Device
Select type and size of overcurrent
protection using Section 3-10.
Reinstall side panel.
Y Special installation may be
required where gasoline or
volatile liquids are present –
see NEC Article 511 or CEC
Section 20.
GND/PE
Earth Ground
4
L1 (U)
L2 (V)
3
ST-117 263-K
Syncrowave 250

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents