Booting The Switch - Dell PowerConnect 5524P User Manual

Powerconnect 5000 series
Hide thumbs Also See for PowerConnect 5524P:
Table of Contents

Advertisement

Booting the Switch

After the local terminal is connected, turn on power. The switch then goes
through power-on self-test (POST). POST runs every time the switch is
started and checks hardware components, to determine if the switch is
operational before completely booting. If the system detects a critical
problem, the boot process stops. If POST passes successfully, a valid
executable image is loaded into RAM. POST messages are displayed on the
terminal and indicate test success or failure.
The boot process runs for approximately 40-45seconds.
When the boot process completes, the following LEDs are lit, as shown in
Figure 7-2:
Power
Status
Fan (should be green)
RPS (if it is being used)
Figure 5-2. Initial LEDs
Dell PowerConnect 55xx Systems User Guide
Power Status
Fan
RPS
57

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerconnect 5548Powerconnect 5548pPowerconnect 5524

Table of Contents