Figure 95 Media Folders for Copy
Although rotation sets and copy sets both increment, the way they increment, and under what
circumstances they increment is slightly different.
When Do Rotation Sets Advance?
The next rotation set is calculated when a new rotation type is defined on the backup job. Apart from
that, it is calculated at the end of a backup job, only if the job was run by the scheduler or from the Run
next schedule command. It is never advanced if it is run manually, using the Run command.
127
User's Guide and Technical Reference