Completing The Installation - IBM 84885BU Maintenance And Troubleshooting Manual

User manual
Table of Contents

Advertisement

3. Make sure the power-supply handle is in the open position; then, slide the
4. If the server is not on, turn on the server.
5. Verify that the dc power LED and the ac power LED on the power supply are lit,

Completing the installation

To complete the installation, you must reinstall the bezel (see "Replacing the bezel"
on page 31), reinstall the frame-support bracket (see "Removing and installing the
support bracket" on page 32), reinstall the side cover (see "Replacing the side
cover" on page 29), connect all the cables and, for certain options, run the
Configuration/Setup Utility program.
60
xSeries 226 Type 8488 and 8648: Hardware Maintenance Manual and Troubleshooting Guide
power supply all the way into the chassis before placing the power-supply
handle into the locked position.
indicating that the power supply is operating properly.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents