Room Ventilation; External Control Equipment - Miele PDR 307 HP CC Operating And Installation Instructions

Heat-pump dryer
Table of Contents

Advertisement

Installation

Room ventilation

- Air drawn in for use in the drying pro-
cess will be warm when it is expelled
back into the room. It is therefore very
important to ensure the room is ad-
equately ventilated, particularly if the
dryer is located in a small room. An
openable window is not classed as
adequate ventilation.
- Make sure the room temperature is
not too high. If there are other heat
producing appliances in the room in
which the dryer is located, make sure
the room is well ventilated and switch
the other appliances off, if possible.
Otherwise running times and energy
consumption could be increased.

External control equipment

An optional accessory unit has to be
purchased to set up a connection with
external systems:
- XCI box communication module
(e.g for peak load control units or pay-
ment systems)
- XCI-AD communication adapter (for
payment systems only)
Payment systems
This tumble dryer can be fitted with a
payment system (optional Miele ac-
cessory). In this case, a Miele Service
technician must programme the relev-
ant settings in the tumble dryer's elec-
tronics and connect the payment sys-
tem.
Coins/tokens must be removed from
the coin box regularly. Otherwise, the
payment system will become blocked.
70

Advertisement

Table of Contents
loading

Table of Contents