The Flow Of The Process Up To Operation - Fujitsu AIRSTAGE UTY-ALGX Instruction Manual

System controller lite for vrf system
Table of Contents

Advertisement

22.

The Flow of the Process up to Operation

This process flow is from the configuration of the electricity meter until the configuration and operation of
the System Controller Lite.
● Energy saving understand, precautions conformation
● Understanding apportionment of electricity, and checking points of caution
Check the items to be decided beforehand
Installing the meter
Configuring the outdoor unit's PCB
(36. The Settings of Outdoor Unit and System Controller Lite)
Unit registration
(8-3-3. Unit registration)
Each type of setting item
Energy saving function
Group setting
(25-1 Energy saving group setting)
Indoor unit rotation operation
(25-2 Indoor unit rotation operation)
Outdoor unit capacity save
(25-3 Outdoor unit capacity save)
Peak cut operation
(25-4 Peak cut operation)
Copyright© 2013-2015 Fujitsu General Limited. All rights reserved.
(24-1 Overview)
(27-1 Overview)
Electricity meter system settings
(23. Creating an electricity meter system)
210
Electricity apportionment
function
Basic Setting
(27-3 Basic Setting)
Indoor Unit Setting
(27-4 Indoor unit electricity calculation setting)
Parameter Setting
(27-5 Parameter setting)
Contract Setting
(27-6 Contract setting)
Block Less Contract
(27-7 Block setting)
Electricity charge apportionment (operation)
(28. Electricity Charge Apportionment)

Advertisement

Table of Contents
loading

Table of Contents