TECHNICAL DATASHEET
CliQ II DIN Rail Power Supply
24 V 60 W 1 Phase, NEC Class 2 / DRP024V060W1N□
Assembly & Installation
The power supply unit (PSU) can be mounted on 35 mm DIN rails in accordance with EN 60715. The device should be installed with
input terminal block at the bottom.
Each device is delivered ready to install.
Mounting
Fig. 2.1 Mounting
Snap on the DIN rail as shown in Fig. 2.1:
1.
Tilt the unit upwards and insert it onto the DIN rail.
2.
Push downwards until stopped.
3.
Press against the bottom front side for locking.
4.
Shake the unit slightly to ensure that it is secured.
In accordance to EN 60950 / UL 60950 and EN 62368 / UL 62368, flexible cables require ferrules.
Use appropriate copper cables designed to sustain operating temperature of:
1.
60°C, 60°C / 75°C for USA
2.
At least 75°C for ambient not exceeding 60°C, and 90°C for ambient exceeding 60°C for Canada.
All parameters are specified at 25°C ambient and AC input unless otherwise indicated.
9
www.DeltaPSU.com (June 2021, Rev. 08)
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Dismounting
Fig. 2.2 Dismounting
To uninstall, pull or slide down the latch with screw driver as
shown in Fig. 2.2. Then slide the power supply unit (PSU) in the
opposite direction, release the latch and pull out the power
supply unit (PSU) from the rail.