13 Operation
13 Operation
13.1 Initialization
NOTICE
▶ Initialisation should be carried out in a depressurised
state, initialisation force = 1/2 nominal force. When initial-
ising under operating pressure, the initialisation force (IO-
Link Index 0x90 - Subindex 3 - Force initialization) must
be adjusted.
Initialisation must be carried out under the following situ-
ations:
- Subsequent mounting of the position transmitter
- Disassembly or replacement of the drive
- Replacing the sealing elements
If the process valve is completely assembled at the factory,
initialisation has already been carried out.
Initialisation can be carried out using the following proced-
ures:
- Initialisation on site
- Initialisation via IO-Link
- Initialisation via configurable digital input (digital input must
be set to "Init")
13.1.1 On-site initialization of the end positions
1. Connect supply voltage.
2. Hold the magnet briefly (>100 ms) at the point on the
housing cover marked with PROG 1.
ð OPEN and CLOSED LEDs flash alternately.
3. Valve automatically moves into the OPEN position.
4. Valve automatically moves into the CLOSED position.
5. Initialization mode is automatically ended.
6. The end positions are set.
13.1.2 Initialization of the end positions via IO-Link
1. Briefly activate (>100 ms) initialization mode (process
data "Selection of operating mode").
ð OPEN and CLOSED LEDs flash alternately.
2. Valve automatically moves into the OPEN position.
3. Valve automatically moves into the CLOSED position.
4. Initialization mode is automatically ended.
5. The end positions are set.
GEMÜ 533 eSyStep
Positioner (Code S0)
13.2 Manual override
Open, actuate and close the manual override with the hexagon
socket (SW3).
1. Unscrew sealing plug 2 anti-clockwise out of cover 1 and
1
2. Operate the manual override 3 with the hexagon socket
54 / 64
remove it.
(WAF3).
ð Turn clockwise to close the valve.
ð Turn anticlockwise to open the valve.
2
1
OPEN
CLOSED
3
www.gemu-group.com