Mounting On A Concrete Foundation By Means Of Stone Bolts Or Foundation Blocks - Siemens FLENDER H SH Series Assembly And Operating Instructions Manual

Gear unit
Table of Contents

Advertisement

6.3.2.3 Mounting on a concrete foundation by means of stone bolts or foundation blocks

Clean the undersurface of the gear­unit base.
Placing stone bolts:
Hook stone bolts with washers and hexagon nuts into the foundation fastening points on the gear­unit
housing (see fig. 37).
The hexagon nuts must only be tightened when the concrete has set.
1
2
3
4
5
Fig. 37: Stone bolt
Placing the foundation blocks:
Hook the foundation blocks with washers and fastening bolts into the foundation fastening points on
the gear­unit housing (see fig. 38).
The fastening bolts must only be tightened when the concrete has set.
1
2
3
4
5
9
6
Fig. 38: Foundation block
Using suitable lifting gear, place the gear unit on the concrete foundation.
Align gear unit horizontally by in­ and output shafts:
─ if using stone bolts, with shims.
─ if using foundation blocks, with the aid of the set screws (if available).
If considerable forces may apply, use stops to prevent the unit from displacement.
Before pouring the concrete foundation, fill up the openings in the foundation blocks with
adequate material such as polystyrene.
With types H1 and H2, remove the air­conducting cowl before tightening the foundation bolts
and then bolt it back into position.
Pour concrete into the recesses of the stone bolts or foundation blocks.
1
Hexagon nut
2
Washer
3
Gear­unit base
4
Stone bolt
5
Foundation
1
Fastening bolt
2
Washer
3
Gear­unit base
7
4
Threaded stud
8
5
Flat steel plate
6
Foundation
7
Final foundation height
8
Prepared foundation height
9
Foundation block
BA 5030 en 02/2013
49 / 96

Advertisement

Table of Contents
loading

Table of Contents