Cable Diagnostics - Planet Networking & Communication GS-5220 Series User Manual

L3 gigabit/10 gigabit managed lcd switch
Table of Contents

Advertisement

4.10.13 Cable Diagnostics

This page is used for running the Cable Diagnostics.
Press to run the diagnostics. This will take approximately 5 seconds. If all ports are selected, this can take approximately 15
seconds. When completed, the page refreshes automatically, and you can view the cable diagnostics results in the cable status
table. Note that Cable Diagnostics is only accurate for cables of length 7 - 140 meters.
10 and 100 Mbps ports will be linked down while running cable diagnostic. Therefore, running cable diagnostic on a 10 or 100
Mbps management port will cause the switch to stop responding until VeriPHY is complete. The VeriPHY Cable Diagnostics
screen in
Figure 4-10-13-1
The page includes the following fields:
Object
Port
• Description
appears.
Figure 4-10-13-1 VeriPHY Cable Diagnostics Page Screenshot
Description
The port where you are requesting Cable Diagnostics.
Display per port description.
User's Manual of GS-5220 LCD Series Managed Switch
400

Advertisement

Table of Contents
loading

Table of Contents