Lenovo ThinkSystem DM3010H Hardware Installation And Maintenance Manual page 24

Table of Contents

Advertisement

Option 1: Cable a two-node switchless cluster
Cable your network connections and your cluster interconnect ports for a two-node switchless
cluster.
Before you begin
Contact your network administrator for information about connecting the system to the
switches.
Be sure to check the illustration arrow for the proper cable connector pull-tab orientation.
As you insert the connector, you should feel it click into place; if you do not
feel it click, remove it, turn the cable head over and try again.
If connecting to an optical switch, insert the SFP into the controller port
before cabling to the port.
About this task
You can use the graphic or the step-by step instructions to complete the cabling between the
controllers and to the switches.
Steps
1. Cable the cluster interconnect ports e0a to e0a and e0b to e0b with the cluster
interconnect cable:
Cluster interconnect cables
18

Advertisement

Table of Contents
loading

This manual is also suitable for:

7dcv

Table of Contents